logistic building + OFfices
Logistics distribution center with 2 warehouses, one of them occupied by the logistics operator SEUR.
Photovoltaic clean energy.
Fire protection system with its water tank.
Temperature area between 10 and 20º. TAPA máximum security certification.
Execution time: Phase 1 (6 months) / Phase 2 (8 months)
Breeam Very Good Certificate.